Design, Civil Engineering Works, Transportation, Installation & Commissioning of a Photovoltaic Park with an installed capacity 550MW, at «MINE DEI PTOLEMAIDA» (ΤΕRNΑ SA).
Design and Construction of a Photovoltaic Park with an installed capacity 449,98MW in the lignite center of Western Macedonia, Amintaio (ΤΕRNA SA).
Earthworks for the levelling of site – PV Station 550MW – DEI – Ptolemaida (ΤΕRΝΑ SA).
Existing Road Network Upgrading Works – Εlliniko -Αrgiroupoli. (Εllinikon S.S.A.)
Design & Construction of temporary access on construction site on the Coastal Front at PM- P1 at Metropolitan Pole of Ellinikon – Agios Kosmas. (Ellinikon S.S.A.).
Existing Road Network Upgrading Works – Permit Design of Hellinikon Access Road to Building Line Α-Π4.18 (Ellinikon S.S.A.).
Design and Construction of Haul Road (Ellinikon S.S.A).
Construction of Motorway EKPPT Section Patra – Pyrgos (ΑKTOR ΑΤΕ).
Earthworks and Demolition at VMC (ΑΚtor ΑΤΕ).
Construction Upgrade of the road axis of Kalloni Sigri, Lesvos – (AKTOR ATE)
Corinth Canal (ΑΚTOR ΑΤΕ).
Construction-Upgrading of road connection of Lefkada city with the road axis ΄΄Road-West Axis΄΄ & construction of a new water supply pipeline in the involved sections – (AKTOR ATE)
Design, Construction and Completion of works for Motorway Elefsina-Korinthos-Patra-Pyrgos-Tsakona G.U. (1-5), (18-21) & (26-33) – (ΑKTOR ΑΤΕ).
Fruit and vegetables standardization and maintenance unit in Amfilochia (2,300 sq.m.) – (AGROGREEN SA)
Remaining Works for Road Connection of Aktio to Western North-South Axis from 0+000 το 48+500 (ΜΕΤΚΑ ΑΤΕ).
Works for Landslide Prevention, V.O.A.K. – Chania – (ΑΚTOR ΑΤΕ).
Construction of the new double Railway Line from 73+135 έως Χ.Θ. 79+150, railway station and E/M works at Kiato – Rododafni Section (ΑΚΤOR ΑΤΕ).
Apion Kleous Motorway (G.U. 30-33). Construction of Water Channels for Irrigation Network Variation & Construction of Storm Water Drainage (ΑΚTOR ΑΤΕ).
Loading and Transportation of Mining Material Araxos- Western Achaia. (HELLENIC QUARRIES S.A).
Execution of Supplementary Works at New Port of Katakolo (KASTOR S.A.).
Works for retaining slopes at Athens Mall 2004, Μarousi (ΑKTOR ΑΤΕ).
Egnatia Odos: Completion of Works from Metsovo Junction to Panagia Junction (3.3-3.5-2) (ΑΚTOR ΑΤΕ).
Completion of Port Construction 2nd Part & Ολοκλήρωση Λιμενικών Έργων 2ου Τμήματος & New Port Infrastructure works – Patra (JV ELTER Α.Τ.Ε ΚΑSTOR Α.Ε).
Technical Connection Projects for Journalists Area, Marousi (AKTOR ΑΤΕ).
Egnatia Odos: Part of Araxthos-Metsovo. Remaining Works from Α/Κ Araxthos to Α/Κ Metsovo (2.4-3.3) (ΑKTOR ΑΤΕ).
Construction of Landfill Β2, Β3, Β5 & Β6 (Β Phase) 2nd ΧYTA & Construction of Phase A 2nd ΧΥΤΑ Western Attica at Skalistiri (HELLENIC QUARRIES SA).
Hydroelectric Project at Klimatia Municipality of Evrimenon at Perfecture of Ioannina (ΑKTOR ΑΤΕ).
New Patras Port 3rd Part 1st Phase (ΑKTOR ΑΤΕ).
Egnatia Odos: Construction from Anilio Exit to Malakasα Tunnel Exit (3.3-3.5.1) (ΑKTOR ΑΤΕ).
Construction of Phase A 2ου ΧΥΤΑ Western Attica Skalisitiri Section Fylis Municipality (HELLECTOR SA).
Egnatia Odos: Construction Part from T8 Exit to A/K Peristeriou (2.4-3.1) (AKTOR ΑΤΕ).
Egnatia Odos: Remaining Works from Metsono Tunnel to Panagias Junction (AKTOR ΑΤΕ).
Egnatia Odos: Remaining Works Part A/K Ioanninon Araxthos River & Tunnels T8 & Driskos (AEGEK Α.Τ.Ε).
Redevelopment of Surrounding Area of Olympic Village (TOMI Α.Τ.Ε WALL TECHNIKI).
Attiki Odos – G.U. Α12 (ΑΚTOR ΑΤΕ).
Redevelopment of Surrounding Area Ο.Α.Κ.Α (AKTOR ΑΤΕ).
Ο.Α.Κ.Α Olympic Stadium ( AKTOR ΑΤΕ).
Construction of Olympic Facilities Beach Volley & Redevelopment of Faliro Bay (TERNA ENERGY)
Athens Metro Line 3 Extension Asomaton to Egaleo (AKTOR ΑΤΕ).
Extension of Kimis Avenue from Ε.Ο. Νο 1 to Olympic Village (JV AKTOR Α.Τ.Ε – PANTEXNIKI
SA J&P AVAX SA).
Attiki odos- D. Plakentias Α.Ο 97 (ALTE Α.Τ.Ε).
Egnatia Odos Construction of Motorway, Part Α/Κ, Ioannina, Araxthos & Tunnel Τ8 (EYKLIDIS Α.Τ.Ε).
Irrigation Project, Thesprotia Phase B (AAGIS SA).
Building construction works & Electromechanical works for the New Museum of Acropolis (ΑLTE Α.Τ.Ε).
Construction of Warehouse Ground floor Phase A Kalivia, Attica (HELLENIC QUARRIES SA).
Διαχείριση Συγκατάθεσης Cookies
Για να παρέχουμε την καλύτερη εμπειρία, χρησιμοποιούμε τεχνολογίες όπως cookies για την αποθήκευση ή/και την πρόσβαση σε πληροφορίες συσκευών. Η συγκατάθεση σε αυτές τις τεχνολογίες θα επιτρέψει σε εμάς να επεξεργαστούμε δεδομένα όπως συμπεριφορά περιήγησης ή μοναδικά αναγνωριστικά σε αυτόν τον ιστότοπο. Η μη συγκατάθεση ή η ανάκληση της συγκατάθεσης, μπορεί να επηρεάσει αρνητικά αρνητικά ορισμένες λειτουργίες και δυνατότητες.
Λειτουργικά
Always active
Η τεχνική αποθήκευση ή πρόσβαση είναι απολύτως απαραίτητη για τον νόμιμο σκοπό της δυνατότητας χρήσης συγκεκριμένης υπηρεσίας που ζητείται ρητά από τον συνδρομητή ή τον χρήστη ή με αποκλειστικό σκοπό τη μετάδοση επικοινωνίας μέσω δικτύου ηλεκτρονικών επικοινωνιών.
Προτιμήσεις
Η τεχνική αποθήκευση ή πρόσβαση είναι απαραίτητη για τον νόμιμο σκοπό της αποθήκευσης προτιμήσεων που δεν ζητούνται από τον συνδρομητή ή τον χρήστη.
Στατιστικά
Η τεχνική αποθήκευση ή πρόσβαση που χρησιμοποιείται αποκλειστικά για στατιστικούς σκοπούς.Η τεχνική αποθήκευση ή πρόσβαση που χρησιμοποιείται αποκλειστικά για ανώνυμους στατιστικούς σκοπούς. Χωρίς κλήτευση, η εθελοντική συμμόρφωση εκ μέρους του Παρόχου Υπηρεσιών Διαδικτύου ή πρόσθετες καταγραφές από τρίτο μέρος, οι πληροφορίες που αποθηκεύονται ή ανακτώνται για το σκοπό αυτό από μόνες τους δεν μπορούν συνήθως να χρησιμοποιηθούν για την αναγνώρισή σας.
Εμπορικής Προώθησης
Η τεχνική αποθήκευση ή πρόσβαση απαιτείται για τη δημιουργία προφίλ χρηστών για την αποστολή διαφημίσεων ή για την καταγραφή του χρήστη σε έναν ιστότοπο ή σε διάφορους ιστότοπους για παρόμοιους σκοπούς εμπορικής προώθησης.